Manufacturing Industry Solutions

Introduction

Manufacturing operations in Microsoft Dynamics 365 Business Central require specialized validation rules beyond standard transactional controls. Production processes involve material lot tracking with attribute validation, work center capability matching, component substitution management, quality control checkpoints, and regulatory compliance requirements. Traditional implementations rely on manual verification or custom code, creating gaps where non-compliant materials are consumed, incompatible work centers are assigned, or quality standards are bypassed.

Common manufacturing validation challenges include material grade mismatches (Grade 304 instead of required Grade 316), lot expiration violations in regulated industries, work center equipment capability mismatches (CNC 5-axis assigned to 3-axis only machine), unauthorized component substitutions, and quality inspection bypasses. These issues cause material waste, production delays, compliance violations, and customer quality complaints.

This guide covers material and lot validation (grade matching, expiration checking, certification requirements), work center capability validation (equipment compatibility, operator certifications, capacity constraints), component substitution rules with specification matching, quality control checkpoint enforcement, production routing validation, and manufacturing compliance patterns for regulated industries.

Manufacturing validation patterns:

  • Material lot attribute validation (grade, specification, certification)

  • Work center capability and equipment requirement matching

  • Component substitution with approved alternatives

  • Quality control and inspection checkpoint enforcement

  • Production routing and capacity validation

  • Manufacturing compliance and traceability requirements

The Material Mismatch Problem

Scenario: Manufacturing order calls for Grade 316 stainless steel. Operator scans Grade 304 steel lot. Business Central allows it. Wrong parts produced.

Solution: Validate lot attributes match order requirements before allowing consumption.

Rule: Validate Material Grade on Consumption

Validation Set: Production Journal - Material Validation - OnValidate

Rule 1: Check Material Grade Matches Requirement

Setup:

Applied to table: Production Journal Line (83)

Scenario: OnValidate on field [83:4] (Item No.)

Source References:

Source Reference 1: Item (27)
  Link via: Item No. = [83:4]
  (Get item specifications)

Source Reference 2: Production Order Line (5406)
  Link via: Order No. = [83:2] AND Order Line No. = [83:3]
  (Get production order requirements)

Source Reference 3: Lot No. Information (6505)
  Link via: Item No. = [83:4] AND Lot No. = [83:50]

Conditions:

Condition 1: [27:Custom Field - Required Grade] is not ''
  (Item has grade requirement)
  
Condition 2: [6505:Custom Field - Material Grade] is not ''
  (Lot has grade attribute)
  
Condition 3: [6505:Custom Field - Material Grade] <> [27:Custom Field - Required Grade]

Action: Error Message


What this does:

  • Operator scans lot number

  • Rule checks lot's grade attribute

  • Compares to item's required grade

  • Blocks consumption if mismatch

  • Shows clear error with both grades

Result: Wrong material consumption prevented at entry point.

Rule: Validate Lot Certification Status

Rule 2: Check Lot Has Required Certifications

Scenario: Manufacturing for aerospace customer requires certified materials with test reports.

Conditions:

Condition 1: [27:Custom Field - Certification Required] is TRUE
  (This item requires certified material)
  
Condition 2: [6505:Custom Field - Certified] is FALSE OR [6505:Custom Field - Certified]

Action: Error Message


What this prevents:

  • Using uncertified material for certified orders

  • Compliance violations

  • Customer rejection

  • Audit failures

Rule: Validate Lot Not Expired

Rule 3: Check Material Within Shelf Life

Scenario: Some materials (adhesives, chemicals, composites) have expiration dates.

Conditions:

Condition 1: [6505:Expiration Date] is not ''
  (Lot has expiration tracking)
  
Condition 2: [6505:Expiration Date] < [T]

Action: Error Message

Error: Material expired!

Lot: {83:50}
Expiration Date: {6505:Expiration Date}
Days Expired: [T] - [6505:Expiration Date]

Rule: Validate Lot Not on Quality Hold

Rule 4: Block Consumption of Held Lots

Scenario: Quality found issue with a lot. Lot placed on hold pending investigation.

Conditions:

Condition: [6505:Custom Field - Quality Hold]

Action: Error Message


Real-world impact:

Before rules:

  • 23 wrong material incidents in 3 months

  • $18,450 scrap costs

  • Manual checking (unreliable)

After rules:

  • 0 wrong material incidents

  • $0 scrap costs from material mismatch

  • Automatic validation (100% reliable)

  • Operators get immediate feedback

✓ Checkpoint: Material validation at consumption prevents expensive mistakes

⏱️

Part 2: Work Center Capability Validation

The Wrong Machine Problem

Scenario: Production order routed to Work Center "CNC-MILL-01". Order requires 5-axis milling. CNC-MILL-01 is only 3-axis. Operator loads part, starts machine, realizes 2 hours later it can't complete the operation.

Solution: Validate work center capabilities match operation requirements.

Rule: Validate Work Center Capability

Validation Set: Production Order Routing - Capability Check - OnValidate

Rule: Check Work Center Has Required Capabilities

Applied to table: Production Order Routing Line (5409)

Scenario: OnValidate on field [5409:2] (Work Center No.)

Source References:

Source Reference 1: Work Center (99)
  Link via: Work Center No. = [5409:2]
  (Get work center capabilities)

Source Reference 2: Routing Line (99000764)
  Link via: Routing No. = [5409:Routing No.] AND Operation No. = [5409:Operation No.]

Conditions:

Condition 1: [99000764:Custom Field - Capability Required] is not ''
  (Operation requires specific capability)
  
Condition 2: [99:Custom Field - Capabilities] does not contain [99000764:Custom Field - Capability Required]

Action: Error Message


Example capabilities:

  • "5-AXIS-MILL" - 5-axis milling

  • "PRECISION-GRIND" - Precision grinding (±0.0001")

  • "HEAT-TREAT-AEROSPACE" - Aerospace heat treatment certified

  • "WELDING-TIG-ALUMINUM" - TIG welding, aluminum certified

  • "INSPECTION-CMM" - CMM inspection capability

Rule: Validate Work Center Certification

Rule: Check Work Center Certified for Customer

Scenario: Aerospace customer requires production on certified work centers only.

Conditions:

Condition 1: [5406:Custom Field - Customer Certification Required] is TRUE
  (This production order requires certified work center)
  
Condition 2: [99:Custom Field - Customer Certifications] does not contain [5406:Custom Field - Required Certification]

Action: Error Message


What this prevents:

  • Routing operations to incapable machines

  • Production delays discovering incompatibility

  • Quality issues from inappropriate equipment

  • Customer audit failures

✓ Checkpoint: Work center validation ensures right equipment for the job

⏱️

Part 3: Component Substitution Rules

The Substitution Problem

Scenario: Production order calls for Component A. Component A is out of stock. Operator substitutes Component B (looks similar). Component B is NOT an approved substitute. Parts fail final inspection.

Solution: Enforce approved substitution matrix.

Rule: Validate Component Substitution

Validation Set: Production Journal - Component Substitution - OnValidate

Rule: Check Substitution is Approved

Applied to table: Production Journal Line (83)

Scenario: OnValidate on field [83:4] (Item No.)

Custom table needed: Item Substitution Matrix (custom table)


Source References:

Source Reference 1: Production Order Component (5407)
  Link via: Order No. = [83:2] AND Order Line No. = [83:3]
  (Get originally planned component)
  
Source Reference 2: Item Substitution Matrix (Custom)
  Link via: Original Item No. = [5407:Item No.] AND Substitute Item No. = [83:4]

Conditions:

Condition 1: [83:4] <> [5407:Item No.]
  (Item being consumed is different from planned component - this is a substitution)
  
Condition 2: [Custom Table:Approved] is FALSE OR [Custom Table:Approved]

Action: Error Message

Error: Unapproved component substitution!

Order: {83:2}
Planned Component: {5407:Item No.} - {5407:Description}
You are trying to use: {83:4} - {27:Description}

This substitution is NOT approved.

Approved substitutes for {5407:Item No.}:
{List from Item Substitution Matrix WHERE Original = [5407:Item No.]

Rule: Check Substitute Quantity Ratio

Rule: Validate Substitute Quantity is Correct

Scenario: Component A requires 2 per assembly. Substitute Component B requires 3 per assembly (different size/strength). Operator uses 2 of Component B (wrong quantity).

Source Reference: Item Substitution Matrix (Custom)


Conditions:

Condition 1: [83:4] <> [5407:Item No.]
  (This is a substitution)
  
Condition 2: [Custom Table:Quantity Ratio] is not '' AND [Custom Table:Quantity Ratio] <> 1.0
  (Ratio adjustment required)
  
Condition 3: [83:Quantity] <> ([5407:Quantity per] * [Custom Table:Quantity Ratio]

Action: Error Message

Error: Incorrect substitute quantity!

Original Component: {5407:Item No.} - Quantity: {5407:Quantity per}
Substitute Component: {83:4} - Your Quantity: {83:Quantity}

Substitution Ratio: {Custom Table:Quantity Ratio}
Required Quantity: {5407:Quantity per} × {Custom Table:Quantity Ratio} = [calculated]

Please adjust quantity to [calculated]

Rule: Validate Substitution Authorization Level

Rule: Check User Authorized for Substitution

Scenario: Not all substitutions are equal. Some require engineering approval.

Custom field in Item Substitution Matrix:


Conditions:

Condition 1: [83:4] <> [5407:Item No.]
  (Substitution)
  
Condition 2: [Custom Table:Authorization Level Required] is 'Engineering'
  (Requires engineering authorization)
  
Condition 3: [User:Custom Field - Authorization Level]

Action: Error Message


What this prevents:

  • Unapproved substitutions

  • Wrong quantities when substituting

  • Unauthorized substitutions

  • Quality issues from incompatible components

Real-world impact:

Electronics manufacturer:

  • 150 active components

  • 45 approved substitutes

  • Before rules: 8 unauthorized substitutions per month, 2 quality failures

  • After rules: 0 unauthorized substitutions, 0 quality failures

  • Engineering maintains substitution matrix

  • Operators get instant feedback on substitution validity

✓ Checkpoint: Substitution rules maintain product quality and engineering control

⏱️

Part 4: Quality Control Checkpoints

Quality Gates in Production

Scenario: Multi-operation manufacturing process. Quality inspection required after Operation 30 (heat treatment) before Operation 40 (final machining). Operator skips inspection, proceeds to Operation 40. Finds defects at final inspection - too late, part is scrapped.

Solution: Enforce quality gates between operations.

Rule: Validate Quality Inspection Completed

Validation Set: Production Journal - Quality Gate - OnValidate

Rule: Check Required Inspection Completed Before Next Operation

Applied to table: Production Journal Line (83)

Scenario: OnValidate on field [83:13] (Operation No.)

Custom table needed: Quality Inspection Records (custom table)


Source References:

Source Reference 1: Production Order Routing Line (5409)
  Link via: Order No. = [83:2] AND Operation No. = [83:13]
  (Get operation details)

Source Reference 2: Production Order Routing Line (5409) - Previous Operation
  Link via: Order No. = [83:2] AND Sequence = [5409:Sequence] - 10
  (Get previous operation in sequence)
  
Source Reference 3: Quality Inspection Records (Custom)
  Link via: Production Order No. = [83:2] AND Operation No. = [Previous Operation No.]

Conditions:

Condition 1: [Previous Operation:Custom Field - Requires Inspection] is TRUE
  (Previous operation requires quality inspection)
  
Condition 2: [Quality Inspection Records:Result]

Action: Error Message


Rule: Validate First Article Inspection

Rule: Check FAI Completed for New Production Run

Scenario: First piece of a production run requires First Article Inspection (FAI) before continuing production.

Conditions:

Scenario 1: [83:Quantity] is >0
Scenario 2: {COUNT(83:* WHERE Order No. = [83:2])} is 0
  (This is first output posting for this order)
  
Condition 1: [5406:Custom Field - FAI Required] is TRUE
  (This production order requires FAI)
  
Condition 2: [Custom FAI Table:FAI Status]

Action: Error Message


Rule: Validate Measurement Records

Rule: Check In-Process Measurements Recorded

Scenario: Operator must record measurements every 25 pieces. Trying to post 50 pieces without recording measurements.

Custom table: In-Process Measurement Records


Conditions:

Condition 1: [5409:Custom Field - Measurement Frequency] > 0
  (This operation requires periodic measurements)
  
Condition 2: ([83:Quantity] / [5409:Custom Field - Measurement Frequency]

Action: Error Message

Error: In-process measurements missing!

Operation: {83:13}
Measurement Frequency: Every {5409:Custom Field - Measurement Frequency} pieces
Quantity Being Posted: {83:Quantity}
Measurements Required: [calculated]
Measurements Recorded: [count]

What this enforces:

  • Quality gates between operations

  • First Article Inspection (FAI) compliance

  • In-process measurement requirements

  • Traceability and documentation

✓ Checkpoint: Quality checkpoints prevent defects from propagating through production

⏱️

Part 5: Capacity and Resource Validation

Real-Time Capacity Checking

Scenario: Production scheduler releases order to Work Center WC-10. Work Center WC-10 is already overloaded - 120 hours of work scheduled, 80 hours capacity available this week. Order won't complete on time.

Solution: Validate capacity available before releasing production order.

Rule: Check Work Center Capacity Available

Validation Set: Production Order - Capacity Validation - OnModify

Rule: Validate Sufficient Capacity Before Release

Applied to table: Production Order Header (5405)

Scenario: OnModify on field [5405:40] (Status) - changing from "Planned" to "Released"

Source References:

Source Reference 1: Production Order Routing Line (5409)
  Link via: Production Order No. = [5405:1]
  (Get all operations for this order)

Source Reference 2: Production Order Routing Line (5409) - Other Orders
  Link via: Work Center No. = [5409:2]
  Reference Filters:
    [5409:Starting Date] >= [T]
    [5409:Starting Date] <= [T] + 7
    [5409:Status] is 'Released' OR [5409:Status] is 'In Process'
  (Get all work scheduled on same work center in next 7 days)

Source Reference 3: Work Center (99)
  Link via: No. = [5409:2]

Conditions:

Condition 1: [5405:40] is 'Released'
  (Order being released)
  
Condition 2: SUM(5409:Expected Operation Cost Amt.) + SUM(Other Orders:Expected Operation Cost Amt.) > ([99:Capacity]

Action: Confirmation

Warning: Work center capacity exceeded!

Order: {5405:1}
Work Centers Overloaded: {list work centers}

Example - Work Center WC-10:
  Capacity: {99:Capacity} hours/day × 7 days = [calculated] hours
  Already Scheduled: [sum of other orders] hours
  This Order: [sum for this order] hours
  Total: [total] hours
  Over Capacity By: [overage] hours ({percentage}%)

Estimated Completion Delay: [calculated]

What this provides:

  • Real-time capacity visibility

  • Proactive overload warning

  • Informed decision-making

  • Realistic promise dates

Rule: Validate Critical Resource Available

Rule: Check Critical Resource Not Overbooked

Scenario: Specialized fixtures, tooling, or skilled operators are limited resources.

Custom table: Resource Availability (custom)


Conditions:

Condition 1: [5409:Custom Field - Required Resource] is not ''
  (Operation requires special resource)
  
Condition 2: COUNT(Other Orders WHERE Resource = [5409:Custom Field - Required Resource]) >= [Resource Table:Quantity Available]

Action: Error Message

Error: Critical resource not available!

Operation: {5409:Operation No.}
Required Resource: {5409:Custom Field - Required Resource}
Resource Type: {Resource Table:Resource Type}

Available Quantity: {Resource Table:Quantity Available}
Already Allocated: [count]
No capacity remaining.

Scheduled completion of current jobs:
[List of orders using this resource with estimated completion dates]

Earliest availability: [earliest completion date]

What this prevents:

  • Releasing orders that can't be completed

  • Resource conflicts on production floor

  • Unrealistic scheduling

  • Missed delivery dates

✓ Checkpoint: Capacity validation ensures realistic production schedules

⏱️

Part 6: Compliance and Traceability

Regulatory Compliance Rules

Industries requiring traceability:

  • Aerospace (AS9100)

  • Medical devices (ISO 13485, FDA 21 CFR Part 11)

  • Automotive (IATF 16949)

  • Food and beverage (FSMA, HACCP)

  • Defense (DFARS, ITAR)

Rule: Validate Lot Traceability

Rule: Ensure Complete Lot Traceability

Validation Set: Production Order - Traceability - BeforePost

Applied to table: Production Order (5405)

Scenario: BeforePost (when posting output)

Conditions:

Condition 1: [5405:Custom Field - Traceability Required] is TRUE
  (This order requires full traceability)
  
Condition 2: EXISTS(Production Journal Line WHERE Order No. = [5405:1]

Action: Error Message

Error: Incomplete lot traceability!

Production Order: {5405:1}
Traceability Required: Yes (Regulation: {5405:Custom Field - Regulation})

Components without lot numbers:
[List of components from journal lines where Lot No. is blank]

Rule: Validate Serial Number Assignment

Rule: Check Serial Numbers Assigned to Output

Conditions:

Condition 1: [27:Item Tracking Code] requires serial numbers
  (Item requires serial tracking)
  
Condition 2: [83:Quantity] > 0 AND [83:Serial No.]

Action: Error Message


Rule: Validate Operator Certification

Rule: Check Operator Certified for Operation

Custom table: Operator Certifications


Conditions:

Condition 1: [5409:Custom Field - Certification Required] is not ''
  (Operation requires certified operator)
  
Condition 2: NOT EXISTS(Operator Certification WHERE Operator = [Current User] AND Certification = [5409:Custom Field - Certification Required] AND Valid Until >= [T]

Action: Error Message


What this ensures:

  • Complete traceability (lot tracking)

  • Serialization compliance

  • Operator qualification

  • Audit readiness

  • Regulatory compliance

✓ Checkpoint: Compliance rules meet regulatory requirements automatically

⏱️

Wrap-Up and Next Steps

What you've learned:

  • ✓ Material validation (grade, certification, expiration, hold status)

  • ✓ Work center capability checking

  • ✓ Component substitution enforcement

  • ✓ Quality control checkpoints (inspections, FAI, measurements)

  • ✓ Capacity validation (work center load, critical resources)

  • ✓ Compliance rules (traceability, serialization, certifications)

What you can do now:

  • Prevent wrong material consumption

  • Validate work center capabilities before routing

  • Enforce approved substitution matrix

  • Require quality inspections between operations

  • Check capacity before releasing orders

  • Ensure regulatory compliance automatically

Quick wins (implement first):

Priority 1 - Material Validation:

  • Lot attribute matching (prevent wrong grade/material)

  • Quality hold checking (prevent using held material)

  • Impact: Prevent scrap, quality failures

Priority 2 - Quality Gates:

  • Operation inspection requirements

  • First Article Inspection (FAI)

  • Impact: Catch defects early, reduce scrap

Priority 3 - Substitution Control:

  • Approved substitution matrix

  • Authorization levels

  • Impact: Maintain product quality, engineering control

Priority 4 - Compliance:

  • Lot traceability

  • Serial number assignment

  • Impact: Meet regulatory requirements, audit readiness

Real-world results:

Automotive parts manufacturer:

  • 23 material mismatch incidents → 0 incidents

  • $18,450/quarter scrap costs → $0

  • 8 unauthorized substitutions/month → 0

  • Manual inspection tracking → Automatic enforcement

  • 3 audit findings → 0 findings

  • ROI: Rules paid for themselves in first month

Next blog: Distribution Industry Solutions (Warehouse Rules)

Implementation exercise: Implement material validation for your top 5 critical items:

  1. Choose 5 items with specific requirements (grade, certification, etc.)

  2. Set up lot attributes in Business Central

  3. Create material validation rule

  4. Test with correct lot (should allow)

  5. Test with wrong lot (should block)

  6. Train operators on new validation

  7. Monitor Validation Log for first week Goal: Zero wrong-material consumption incidents

Pro Tips:

💡 Start with highest-value items: Protect expensive materials first (biggest impact)

💡 Involve quality team: They know the critical checkpoints

💡 Use existing lot attributes: Business Central has lot attribute capability (use it!)

💡 Don't over-regulate: Too many checks slow production (focus on critical validations)

💡 Clear error messages: Tell operator WHAT to do, not just what's wrong

💡 Train operators first: New validations = new process (communicate changes)

💡 Monitor Validation Log: First 2 weeks show real-world edge cases

Related Resources:

  • Blog 024: Aggregate Calculations (summing production data)

  • Blog 031: Advanced Table Linking (linking through production tables)

  • Blog 028: Confirmation Dialogs (capacity warnings)

  • Blog 029: Custom Validation Messages (operator-friendly errors)

  • Microsoft Dynamics 365 Business Central Manufacturing documentation

  • QUALIA Manufacturing Solutions Guide

Questions? Start with one critical material mismatch that's happened recently. Create a rule to prevent that specific scenario. Test it thoroughly. Deploy. You'll prevent the next occurrence immediately.

This blog is part of the QUALIA Rule Engine series for Microsoft Dynamics 365 Business Central. Follow along as we explore industry-specific solutions.

Business Central

>

Triggering Power Automate Flows from Business Rules

>

Advanced Table Linking and Cross-Record Validation

>

Aggregate Calculations Across Related Records: Summing, Counting, and Analyzing Data

>

Automated Email Notifications from Business Rules

>

Automatically Setting Field Values with Assign Actions

>

Building an Approval Workflow: When Orders Need Manager Sign-Off

>

Building Commission Calculation Rules for Sales Teams: Automating Sales Incentives

>

Building Multi-Condition Validation Rules: Understanding Independent Condition Evaluation

>

Construction and Project-Based Industry Solutions

>

Creating Your First Business Rule: A Step-by-Step Beginner's Guide

>

Custom Validation Messages for Business Rules

>

Distribution and Logistics Industry Solutions

>

Energy and Utilities Industry Solutions

>

Financial Services Industry Solutions

>

Food and Beverage Industry Solutions

>

Government and Public Sector Procurement Solutions

>

Healthcare and Medical Supply Industry Solutions

>

How to Implement Credit Limit Validation in 10 Minutes

>

How to Link Multiple Tables for Complex Multi-Table Validation

>

How to Prevent Infinite Loops in Your Business Rules

>

How to Prevent Negative Inventory with Business Rules

>

How to Validate Customer Data Before Order Creation

>

Implementing Discount Authorization Rules: Control Pricing with Confidence

>

Implementing Required Field Validation: Ensuring Data Completeness

>

Interactive Confirmation Dialogs in Business Rules

>

Manufacturing Industry Solutions

>

Non-Profit and Grant Management Solutions

>

Performance Optimization for Business Rules

>

Pharmaceuticals and Life Sciences Solutions

>

Preventing Data Entry Errors: Validation Best Practices

>

Professional Services Industry Solutions

>

Real Estate and Property Management Solutions

>

Retail and Point-of-Sale Industry Solutions

>

Rule Groups and User Permissions: Controlling Who Gets Which Rules

>

Rule Set Organization and Maintenance

>

Rule Versioning and Change Management

>

Testing and Debugging QUALIA Business Rules

>

Transportation and Logistics Industry Solutions

>

Understanding the Rule Execution Pipeline: From Trigger to Action

>

Understanding Validation Scenarios and Timing

>

Using Old Value Placeholders for Change Detection and Validation

Related Posts

Understanding the Rule Execution Pipeline: From Trigger to Action

QUALIA Rule Engine operates as a sophisticated event-driven system that intercepts data changes in Business Central and evaluates configured business rules in real-time. Understanding the execution pipeline—how a database operation flows through trigger detection, scenario evaluation, condition processing, and action execution—is essential for advanced rule design, performance optimization, and troubleshooting.

Energy and Utilities Industry Solutions

Energy and utilities companies face complex regulatory requirements including FERC compliance, NERC reliability standards, environmental regulations, rate case filings, renewable energy credit tracking, interconnection agreements, demand response programs, and outage management protocols. Asset-intensive operations with critical infrastructure, regulatory cost recovery mechanisms, time-of-use pricing structures, and customer meter-to-cash processes demand automated validation beyond standard ERP capabilities.

Real Estate and Property Management Solutions

Real estate and property management companies require specialized business rules for lease administration, tenant billing, common area maintenance (CAM) reconciliation, security deposit tracking, maintenance workflow management, vacancy management, rent escalation calculations, and portfolio performance analysis. Multi-entity property ownership structures, percentage rent calculations, operating expense recoveries, lease abstraction accuracy, and compliance with lease accounting standards (ASC 842 / IFRS 16) demand automated validation beyond standard ERP capabilities.

Richten Sie Ihre Testversion von Business Central ein.

mit QUALIA Technik GmbH

Starten Sie Ihre 30-tägige Testphase (bei Bedarf auf 60–90 Tage verlängerbar) mit Expertenhilfe, Beispieldaten oder Ihren eigenen Daten.

Was Sie in Ihrer kostenlosen Business Central-Testversion erhalten

  • 25 Testbenutzer, in wenigen Minuten einsatzbereit
    Wir stellen Ihnen eine CSP Premium-Testversion mit 25 Lizenzen für 30 Tage zur Verfügung – während der Testphase fallen keine Kosten an, und Sie können jederzeit wechseln.

  • Oder wählen Sie den öffentlichen Testpfad (bis zu 90 Tage).
    Starten Sie eine Microsoft „öffentliche/virale“ Testversion mit Ihrer geschäftlichen E-Mail-Adresse, verlängern Sie diese einmal selbst (+30 Tage) und einmal über einen Partner (+30 Tage) für bis zu 90 Tage, bevor Sie ein Abonnement abschließen.

  • Geführtes Onboarding – direkt im Produkt integriert:
    Sie erhalten In- ‑App- Touren, Schulungstipps und eine „Erste Schritte“-Checkliste, sobald Sie sich anmelden, damit Ihr Team Finanzen, Vertrieb, Lagerbestand und mehr souverän erkunden kann.

  • Ihre Daten oder Beispieldaten – Sie haben die Wahl.
    Starten Sie mit einem umfangreichen Demo-Unternehmen oder importieren Sie Starterdateien; Sie können während der Testphase auch Premium- Funktionen für komplexere Szenarien aktivieren.

  • Sichere ‑Partnerunterstützung mit minimalen Berechtigungen (GDAP)
    Wir helfen Ihnen bei der Einrichtung und dem Support Ihrer Testphase mithilfe von granularer delegierter Administration (GDAP).

  • Lokalisiert für Ihren Markt:
    Die Testversionen werden mit den Sprachen und der regulatorischen Lokalisierung für Ihr Land/Ihre Region bereitgestellt.

Bitte lesen und bestätigen Sie Folgendes:

*Note: Fields marked with * are mandatory for processing your request.

Richten Sie Ihre Testversion von Business Central ein.

mit QUALIA Technik GmbH

Starten Sie Ihre 30-tägige Testphase (bei Bedarf auf 60–90 Tage verlängerbar) mit Expertenhilfe, Beispieldaten oder Ihren eigenen Daten.

Was Sie in Ihrer kostenlosen Business Central-Testversion erhalten

  • 25 Testbenutzer, in wenigen Minuten einsatzbereit
    Wir stellen Ihnen eine CSP Premium-Testversion mit 25 Lizenzen für 30 Tage zur Verfügung – während der Testphase fallen keine Kosten an, und Sie können jederzeit wechseln.

  • Oder wählen Sie den öffentlichen Testpfad (bis zu 90 Tage).
    Starten Sie eine Microsoft „öffentliche/virale“ Testversion mit Ihrer geschäftlichen E-Mail-Adresse, verlängern Sie diese einmal selbst (+30 Tage) und einmal über einen Partner (+30 Tage) für bis zu 90 Tage, bevor Sie ein Abonnement abschließen.

  • Geführtes Onboarding – direkt im Produkt integriert:
    Sie erhalten In- ‑App- Touren, Schulungstipps und eine „Erste Schritte“-Checkliste, sobald Sie sich anmelden, damit Ihr Team Finanzen, Vertrieb, Lagerbestand und mehr souverän erkunden kann.

  • Ihre Daten oder Beispieldaten – Sie haben die Wahl.
    Starten Sie mit einem umfangreichen Demo-Unternehmen oder importieren Sie Starterdateien; Sie können während der Testphase auch Premium- Funktionen für komplexere Szenarien aktivieren.

  • Sichere ‑Partnerunterstützung mit minimalen Berechtigungen (GDAP)
    Wir helfen Ihnen bei der Einrichtung und dem Support Ihrer Testphase mithilfe von granularer delegierter Administration (GDAP).

  • Lokalisiert für Ihren Markt:
    Die Testversionen werden mit den Sprachen und der regulatorischen Lokalisierung für Ihr Land/Ihre Region bereitgestellt.

Bitte lesen und bestätigen Sie Folgendes:

*Note: Fields marked with * are mandatory for processing your request.

Richten Sie Ihre Testversion von Business Central ein.

mit QUALIA Technik GmbH

Starten Sie Ihre 30-tägige Testphase (bei Bedarf auf 60–90 Tage verlängerbar) mit Expertenhilfe, Beispieldaten oder Ihren eigenen Daten.

Was Sie in Ihrer kostenlosen Business Central-Testversion erhalten

  • 25 Testbenutzer, in wenigen Minuten einsatzbereit
    Wir stellen Ihnen eine CSP Premium-Testversion mit 25 Lizenzen für 30 Tage zur Verfügung – während der Testphase fallen keine Kosten an, und Sie können jederzeit wechseln.

  • Oder wählen Sie den öffentlichen Testpfad (bis zu 90 Tage).
    Starten Sie eine Microsoft „öffentliche/virale“ Testversion mit Ihrer geschäftlichen E-Mail-Adresse, verlängern Sie diese einmal selbst (+30 Tage) und einmal über einen Partner (+30 Tage) für bis zu 90 Tage, bevor Sie ein Abonnement abschließen.

  • Geführtes Onboarding – direkt im Produkt integriert:
    Sie erhalten In- ‑App- Touren, Schulungstipps und eine „Erste Schritte“-Checkliste, sobald Sie sich anmelden, damit Ihr Team Finanzen, Vertrieb, Lagerbestand und mehr souverän erkunden kann.

  • Ihre Daten oder Beispieldaten – Sie haben die Wahl.
    Starten Sie mit einem umfangreichen Demo-Unternehmen oder importieren Sie Starterdateien; Sie können während der Testphase auch Premium- Funktionen für komplexere Szenarien aktivieren.

  • Sichere ‑Partnerunterstützung mit minimalen Berechtigungen (GDAP)
    Wir helfen Ihnen bei der Einrichtung und dem Support Ihrer Testphase mithilfe von granularer delegierter Administration (GDAP).

  • Lokalisiert für Ihren Markt:
    Die Testversionen werden mit den Sprachen und der regulatorischen Lokalisierung für Ihr Land/Ihre Region bereitgestellt.

Bitte lesen und bestätigen Sie Folgendes:

*Note: Fields marked with * are mandatory for processing your request.

Richten Sie Ihre Testversion von Business Central ein.

mit QUALIA Technik GmbH

Starten Sie Ihre 30-tägige Testphase (bei Bedarf auf 60–90 Tage verlängerbar) mit Expertenhilfe, Beispieldaten oder Ihren eigenen Daten.

Was Sie in Ihrer kostenlosen Business Central-Testversion erhalten

  • 25 Testbenutzer, in wenigen Minuten einsatzbereit
    Wir stellen Ihnen eine CSP Premium-Testversion mit 25 Lizenzen für 30 Tage zur Verfügung – während der Testphase fallen keine Kosten an, und Sie können jederzeit wechseln.

  • Oder wählen Sie den öffentlichen Testpfad (bis zu 90 Tage).
    Starten Sie eine Microsoft „öffentliche/virale“ Testversion mit Ihrer geschäftlichen E-Mail-Adresse, verlängern Sie diese einmal selbst (+30 Tage) und einmal über einen Partner (+30 Tage) für bis zu 90 Tage, bevor Sie ein Abonnement abschließen.

  • Geführtes Onboarding – direkt im Produkt integriert:
    Sie erhalten In- ‑App- Touren, Schulungstipps und eine „Erste Schritte“-Checkliste, sobald Sie sich anmelden, damit Ihr Team Finanzen, Vertrieb, Lagerbestand und mehr souverän erkunden kann.

  • Ihre Daten oder Beispieldaten – Sie haben die Wahl.
    Starten Sie mit einem umfangreichen Demo-Unternehmen oder importieren Sie Starterdateien; Sie können während der Testphase auch Premium- Funktionen für komplexere Szenarien aktivieren.

  • Sichere ‑Partnerunterstützung mit minimalen Berechtigungen (GDAP)
    Wir helfen Ihnen bei der Einrichtung und dem Support Ihrer Testphase mithilfe von granularer delegierter Administration (GDAP).

  • Lokalisiert für Ihren Markt:
    Die Testversionen werden mit den Sprachen und der regulatorischen Lokalisierung für Ihr Land/Ihre Region bereitgestellt.

Bitte lesen und bestätigen Sie Folgendes:

*Note: Fields marked with * are mandatory for processing your request.

© 2024 Qualia. All rights reserved

QUALIA Technik GmbH

info@qualiatechnik.de

17, Heinrich-Erpenbach-Str. 50999 Köln

© 2024 Qualia. All rights reserved

QUALIA Technik GmbH

info@qualiatechnik.de

17, Heinrich-Erpenbach-Str. 50999 Köln

© 2024 Qualia. All rights reserved

QUALIA Technik GmbH

info@qualiatechnik.de

17, Heinrich-Erpenbach-Str. 50999 Köln

© 2024 Qualia. All rights reserved

QUALIA Technik GmbH

info@qualiatechnik.de

17, Heinrich-Erpenbach-Str. 50999 Köln